Scarsdale High School- Scarsdale, NY
The 50,000 sq. ft. additions to the existing high school included a two story structure with a basketball and general athletics gymnasium, main entrance, connecting corridors and wrestling room on the main floor, with locker rooms, bathrooms, offices and storage located on the ground floor. The exterior walls were built using a combination of concrete, C.M.U., brick and precast concrete. The interior floor finishes included a combination of ceramic, porcelain and terrazzo tiles, a poured in place rubber floor system, wood, V.C.T. and epoxy paint material.
Hither Hills State Park- Montauk, NY
New Men and Women Rest rooms, Indoor Shelter and Concession Stand at Hither Hills State Park, Montauk, NY. Approximately 11,000 s.f. New Construction
New York State Police Station- Islip, NY
Construction of New Police Station for The New York State Police, Islip, NY
Archangel Michael Greek Orthodox Church-
Port Washington, NY
Upon the completion of the school, administration offices and fellowship hall buildings in September of 2009, the 4.6 acre site at 100 Fairway Drive, Port Washington, NY is the new home of the Archangel Michael Church. The church and chapel buildings are scheduled to be completed and occupied by the spring of 2012.